Project background:
India's TATA Steel has a glorious history in the steel industry for more than 100 years. This cooperation with CFTC is the desulfurization powder project. Customers have purchased 3 sets of MTW138 European version of the mill from CFTC.
Project design:In combination with the various needs of customers, the CFTC team adopts a tower-like design with a total height of about 25 meters and adopts three parallel connections, with a total production capacity of 30 tons. The overall process is simple and the degree of automation is high; the whole system is operated under negative pressure, the dust does not overflow and the cleaning is ensured; at the same time, the chemical composition of the finished product is stable, the particle gradation is uniform, the fineness of the product is adjustable, and the flue gas desulfurization is good. The appropriate limestone powder is needed to improve the desulfurization efficiency.
1, all links are strictly controlled, race against time
We must respect the strict standards of our customers' businesses and actively cooperate with our customers. From initial customer enquiries, factory visits, business negotiations, factory inspections, installation and commissioning, we have strictly adhered to the quality of our customers and our company. The standard, focusing on the combination of efficiency and quality, has successfully completed the customer's project cycle requirements. In order to cope with the rainy weather, in addition to building rain-proof facilities, we often work overtime, even at night, to complete the deadlines of the owners.
2, equipment system optimization and upgrade
In order to ensure sufficient conveying capacity, we recalculated the wind pressure and wind pressure required by the system and increased the fan model; the piping design and layout, the efficiency of the dust removal system and the mill pressure system were improved and optimized.
3. Coordinate the use of local resources
Combining the experience of large foreign EPC projects in the past, we coordinated the use of local and domestic experienced technicians to form professional teams in equipment, power, steel structure, civil engineering, etc. At the same time, we established a project management team to supervise and supervise the smooth progress of the entire project. By coordinating the use of local resources, the technical and emotional exchanges between the two sides have been greatly promoted.
Customer feedback:
1. We have purchased project equipment from Germany, the United States, India and other countries around the world. This cooperation with CFTC has left a deep impression on us. Now China's equipment is indeed no worse than Europe and America.
2, from the rapid response of the previous inquiry, to the after-sales service in the latter, the feeling of giving us the whole is indeed for the sake of customers. Especially during the installation period of the equipment, engineers and employees of the Indian office are stationed at our site for follow-up, and they are responsible and responsible.
3. The key point is that the power plant is particularly satisfied with our desulfurizers; the details are also well controlled, and the international standard control system also makes our work simple. We are currently negotiating other grinding projects and hope to reach the next cooperation intention as soon as possible.